{"id":6375,"date":"2025-01-07T05:50:42","date_gmt":"2025-01-07T05:50:42","guid":{"rendered":"https:\/\/dchhk.com\/?p=6375"},"modified":"2025-01-07T06:52:55","modified_gmt":"2025-01-07T06:52:55","slug":"lo-trinh-trien-khai-cac-tuyen-cap-quang-truc-bac-nam","status":"publish","type":"post","link":"https:\/\/dchhk.net\/en\/lo-trinh-trien-khai-cac-tuyen-cap-quang-truc-bac-nam\/","title":{"rendered":"ROADMAP FOR DEPLOYING NORTH-SOUTH BACKBONE"},"content":{"rendered":"<p class=\"has-text-align-justify has-vivid-red-color has-text-color has-link-color has-medium-font-size wp-elements-3df12df42a7f41bbbb16dc89853759f0 wp-block-paragraph\"><strong>DCH Telecom's North-South backbone development plan is in the process of completing the implementation license as well as starting the first steps in preparation to ensure a safe and stable transmission network for all other projects of DCH Group.<\/strong>.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/dchhk.com\/wp-content\/uploads\/2025\/01\/ANH-DAI-DIEN-BAI-VIET-01.png\" alt=\"\" class=\"wp-image-6376\" srcset=\"\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" data-srcset=\"\" \/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"has-text-align-center has-vivid-red-color has-text-color has-link-color has-medium-font-size wp-elements-b661f1b2899367d7919f009836501670 wp-block-paragraph\"><strong>PHASE 1<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-justify has-text-color has-link-color has-medium-font-size wp-elements-f4e095bb50c8ff568d3538f3f6405754 wp-block-paragraph\" style=\"color:#060673\">This network consists of a system of many network nodes located at 20kV\/500kV transformer stations of the power company connected via OPGW optical fiber on the power transmission line, Deploying buried or leased optical fiber cables along the North-South expressway and to the provinces. Along with the development of the Leased Channel system, DCH TELECOM Company will build the main RING transmission network (with a capacity of 40Gbps) into a backbone network connecting Hanoi, Da Nang and Ho Chi Minh City.<\/p>\n\n\n\n<p class=\"has-text-align-center has-vivid-red-color has-text-color has-link-color has-medium-font-size wp-elements-b9dad4d73428db4e9a22927bcfc9f4eb wp-block-paragraph\"><strong>PHASE 2<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-justify has-text-color has-link-color has-medium-font-size wp-elements-6d1a628e8a788c5801c79bf9a40e98ec wp-block-paragraph\" style=\"color:#060673\">Continue to deploy phase 2 according to the planned DCH transmission network diagram, Deploy additional backup transmission lines on the 220kV\/500kV line and buried cables according to the progress of the investment phases. During this phase, DCH TELECOM Company will invest heavily in the inter-provincial optical cable system along the North-South expressway axis to provide closed-loop services. The closed-loop connection will increase the network's redundancy capacity, thereby ensuring the stability and availability of the service with a total cable length of 1,160 km.<\/p>\n\n\n\n<p class=\"has-text-align-center has-vivid-red-color has-text-color has-link-color has-medium-font-size wp-elements-0e31f9456d1f85df5b4c28f2b1f7541b wp-block-paragraph\"><strong>GIAI \u0110O\u1ea0N 3<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-justify has-text-color has-link-color has-medium-font-size wp-elements-f81be9885776f8b33ca4255dcd42b624 wp-block-paragraph translation-block\" style=\"color:#060673\">During this period, <strong>DCH TELECOM<\/strong> continues to invest heavily to complete the buried cable system along the North-South expressway axis with a total length of nearly 3,000 km to provide closed-loop services. The closed-loop connection will increase the network's redundancy, thereby ensuring the stability and availability of services, ... In parallel with the installation of new equipment, <strong>DCH TELECOM<\/strong> will invest heavily in inter-provincial optical cable lines to connect newly formed level 2 POPs to form a nationwide Ring network to ensure the provision of full services to customers.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"718\" src=\"https:\/\/dchhk.com\/wp-content\/uploads\/2025\/01\/HINH-BAI-VIET-e-01-01-01.png\" alt=\"\" class=\"wp-image-6381\" srcset=\"\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" data-srcset=\"\" \/><\/figure>\n<\/div>\n\n\n<p class=\"has-text-align-justify has-text-color has-link-color has-medium-font-size wp-elements-fce437478b32776abe905dba71f6face wp-block-paragraph\" style=\"color:#060673\">It is expected that after completing the cable lines, DCH TELECOM Company will upgrade the entire domestic transmission line as follows:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"has-text-color has-link-color has-medium-font-size wp-elements-7a2a7dfbfab4e21047263d9e4b7e3903\" style=\"color:#060673\"><strong>The Northern optical cable line to Huu Nghi Border Gate - Lang Son has a capacity of 10Gbps.<\/strong><\/li>\n\n\n\n<li class=\"has-text-color has-link-color has-medium-font-size wp-elements-060a549663b54eb54f88f2726a6f401f\" style=\"color:#060673\"><strong>The Hanoi - Da Nang optical cable line will have a capacity of 40Gbps.<\/strong><\/li>\n\n\n\n<li class=\"has-text-color has-link-color has-medium-font-size wp-elements-0647f95a43b645ef0d6e506ec32cf167\" style=\"color:#060673\"><strong>The Danang \u2013 Ho Chi Minh City fiber optic cable line will have a capacity of 40Gbps.<\/strong><\/li>\n\n\n\n<li class=\"has-text-color has-link-color has-medium-font-size wp-elements-38ce00daa85f9e187f70f49dc153851a\" style=\"color:#060673\"><strong>The Southern optical cable line to Moc Bai - Tay Ninh border gate has a capacity of 10Gbps.<\/strong><\/li>\n<\/ul>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"777\" src=\"https:\/\/dchhk.com\/wp-content\/uploads\/2025\/01\/SO-DO-CAP-CAO-TOC-DUONG-RAY-01-1.png\" alt=\"\" class=\"wp-image-6378\" srcset=\"\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" data-srcset=\"\" \/><\/figure>\n<\/div>\n\n\n<p class=\"has-text-align-justify has-text-color has-link-color has-medium-font-size wp-elements-b073b468e38d9ac302571bf037921ef9 wp-block-paragraph\" style=\"color:#060673\">Thus, after completion, the DCH Telecom transmission network is upgraded to a total capacity of 32 Tbps, with a North-South backup of 1+2, connecting to the border fiber optic cable stations of Tan Thanh - Lang Son, Chau Doc - An Giang, Moc Bai - Tay Ninh, the AAG, IA, AAE1, APG submarine cable landing stations with 1+1 protection - all combined to create a solid infrastructure foundation for domestic and international transmission connections.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>K\u1ebf ho\u1ea1ch ph\u00e1t tri\u1ec3n c\u00e1c tuy\u1ebfn truy\u1ec1n d\u1eabn B\u1eafc &#8211; Nam c\u1ee7a C\u00f4ng ty DCH Telecom \u0111ang trong qu\u00e1 tr\u00ecnh ho\u00e0n thi\u1ec7n gi\u1ea5y ph\u00e9p tri\u1ec3n khai c\u0169ng nh\u01b0 b\u1eaft \u0111\u1ea7u c\u00e1c b\u01b0\u1edbc \u0111\u1ea7u ti\u00ean trong vi\u1ec7c chu\u1ea9n b\u1ecb nh\u1eb1m d\u1ea3m b\u1ea3o m\u1ed9t m\u1ea1ng l\u01b0\u1edbi truy\u1ec1n d\u1eabn an to\u00e0n &#8211; v\u1eefng ch\u1eafc cho to\u00e0n b\u1ed9 c\u00e1c [&#8230;]\n","protected":false},"author":1,"featured_media":6376,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[4,9],"tags":[],"class_list":["post-6375","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-du-an","category-du-an-noi-bat"],"_links":{"self":[{"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/posts\/6375","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/comments?post=6375"}],"version-history":[{"count":3,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/posts\/6375\/revisions"}],"predecessor-version":[{"id":6382,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/posts\/6375\/revisions\/6382"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/media\/6376"}],"wp:attachment":[{"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/media?parent=6375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/categories?post=6375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/tags?post=6375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}