{"id":7581,"date":"2026-03-27T06:41:48","date_gmt":"2026-03-27T06:41:48","guid":{"rendered":"https:\/\/dchhk.com\/?p=7581"},"modified":"2026-03-24T07:09:36","modified_gmt":"2026-03-24T07:09:36","slug":"gan-14-900-ty-dong-xay-dung-trung-tam-du-lieu-quan-ly-giam-sat-xu-ly-vi-pham-va-dieu-hanh-giao-thong","status":"publish","type":"post","link":"https:\/\/dchhk.net\/en\/gan-14-900-ty-dong-xay-dung-trung-tam-du-lieu-quan-ly-giam-sat-xu-ly-vi-pham-va-dieu-hanh-giao-thong\/","title":{"rendered":"VND 14.9 TRILLION INVESTED IN BUILDING A DATA CENTER FOR TRAFFIC MANAGEMENT, MONITORING, VIOLATION PROCESSING, AND OPERATIONS"},"content":{"rendered":"<p class=\"has-text-align-justify has-text-color has-link-color has-medium-font-size wp-elements-3a47735cdcff708d8bc9608745c7cfb9 wp-block-paragraph\" style=\"color:#060673\">Deputy Prime Minister Tr\u1ea7n H\u1ed3ng H\u00e0 has signed a decision approving the Project on \u201cBuilding a Data Center for Traffic Management, Monitoring, Violation Processing, and Traffic Operations for the 2026\u20132030 period, with a vision to 2050. According to the Project, the data center will be developed into a national traffic governance system based on a unified two-tier model, ensuring nationwide connectivity and integration. <\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"584\" src=\"https:\/\/dchhk.com\/wp-content\/uploads\/2026\/03\/tham-gia-giao-thong-1.jpg\" alt=\"\" class=\"wp-image-7583\" srcset=\"https:\/\/dchhk.net\/wp-content\/uploads\/2026\/03\/tham-gia-giao-thong-1.jpg 900w, https:\/\/dchhk.net\/wp-content\/uploads\/2026\/03\/tham-gia-giao-thong-1-300x195.jpg 300w, https:\/\/dchhk.net\/wp-content\/uploads\/2026\/03\/tham-gia-giao-thong-1-768x498.jpg 768w, https:\/\/dchhk.net\/wp-content\/uploads\/2026\/03\/tham-gia-giao-thong-1-18x12.jpg 18w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"has-text-align-justify has-text-color has-link-color has-medium-font-size wp-elements-c1cf334663c172033b5df52eded95855 wp-block-paragraph\" style=\"color:#060673\">The Level 1 Center will serve as the core hub responsible for coordination, data aggregation, analysis, and inter-regional traffic operations support. This center will operate by inheriting, integrating, and upgrading existing systems, databases, and technological platforms. It will establish a shared data platform serving all relevant forces while connecting with national databases.\n\nCentralized data will include traffic monitoring, violation handling, vehicle registration and management, traffic accidents, journey monitoring devices, and other related operational systems. <\/p>\n\n\n\n<p class=\"has-text-align-justify has-text-color has-link-color has-medium-font-size wp-elements-d9f4ad23464c77b3f479ddc4db006bbb wp-block-paragraph\" style=\"color:#060673\">The Level 2 Centers will be developed and upgraded at the local level to directly manage and operate traffic systems according to decentralization. These centers will ensure synchronization and seamless connectivity with the Level 1 Center and other Level 2 Centers. Investment will be tailored based on population size, vehicle density, traffic complexity, and actual local needs.<\/p>\n\n\n\n<p class=\"has-text-align-justify has-text-color has-link-color has-medium-font-size wp-elements-10df3914e28a317ec6466a7e0f4a92f6 wp-block-paragraph\" style=\"color:#060673\">The Project will be implemented nationwide from 2026 to 2050, divided into three phases. The first phase (2026\u20132028) will focus on building the foundational infrastructure, establishing the system, and initiating operations. The second phase (2029\u20132030) will expand deployment and enhance data-driven traffic management capabilities. The total estimated investment for the 2026\u20132030 period is nearly VND 14.9 trillion, excluding operational, maintenance, and ongoing system management costs.\n\nThe third phase (2031\u20132050) aims to complete a modern, nationwide digital traffic governance system. Funding for this phase will be determined based on the results of the earlier stages and actual needs. <\/p>\n\n\n\n<p class=\"has-text-align-justify has-text-color has-link-color has-medium-font-size wp-elements-237409e981884c0781b7ad2a67db37f0 wp-block-paragraph\" style=\"color:#060673\">By 2030, the Project aims to expand traffic surveillance camera systems across expressways, national highways, provincial roads, urban roads, and key transport routes, with gradual expansion to railways and inland waterways.\n\nAt the same time, it will complete a data- and AI-driven traffic operations platform capable of detecting violations, performing analytics, forecasting, and real-time traffic coordination. <\/p>\n\n\n\n<p class=\"has-text-align-justify has-text-color has-link-color has-medium-font-size wp-elements-794e7222f3814441acf00650b47468bf wp-block-paragraph\" style=\"color:#060673\">By 2050, the goal is to fully establish a modern, interconnected national traffic management system covering all road, rail, and inland waterway networks; upgrade technological capabilities of both Level 1 and Level 2 Centers to advanced, highly automated standards; and effectively apply big data and artificial intelligence in traffic operations. <\/p>\n\n\n\n<p class=\"has-text-color has-link-color has-medium-font-size wp-elements-0ebc59685e78c69e8a2d7ed91fdb7786 wp-block-paragraph\" style=\"color:#060673\">Source: Gia Lai News<\/p>","protected":false},"excerpt":{"rendered":"<p>Ph\u00f3 Th\u1ee7 t\u01b0\u1edbng Tr\u1ea7n H\u1ed3ng H\u00e0 k\u00fd quy\u1ebft \u0111\u1ecbnh ph\u00ea duy\u1ec7t \u0110\u1ec1 \u00e1n \u201cX\u00e2y d\u1ef1ng Trung t\u00e2m d\u1eef li\u1ec7u, qu\u1ea3n l\u00fd, gi\u00e1m s\u00e1t, x\u1eed l\u00fd vi ph\u1ea1m v\u00e0 \u0111i\u1ec1u h\u00e0nh giao th\u00f4ng giai \u0111o\u1ea1n 2026-2030, t\u1ea7m nh\u00ecn \u0111\u1ebfn n\u0103m 2050\u201d. Theo \u0110\u1ec1 \u00e1n, Trung t\u00e2m d\u1eef li\u1ec7u, qu\u1ea3n l\u00fd, gi\u00e1m s\u00e1t, x\u1eed l\u00fd vi ph\u1ea1m [&#8230;]\n","protected":false},"author":1,"featured_media":7582,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[3,10],"tags":[],"class_list":["post-7581","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc","category-tin-tuc-noi-bat"],"_links":{"self":[{"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/posts\/7581","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/comments?post=7581"}],"version-history":[{"count":2,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/posts\/7581\/revisions"}],"predecessor-version":[{"id":7585,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/posts\/7581\/revisions\/7585"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/media\/7582"}],"wp:attachment":[{"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/media?parent=7581"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/categories?post=7581"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dchhk.net\/en\/wp-json\/wp\/v2\/tags?post=7581"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}